Show simple item record

dc.contributor.advisorTimmusk, Toomas
dc.contributor.advisorPiir, Andres
dc.contributor.authorUdras, Edvin
dc.date.accessioned2015-06-04T06:12:51Z
dc.date.available2015-06-04T06:12:51Z
dc.date.issued2015
dc.identifier.urihttp://hdl.handle.net/10492/2340
dc.description.abstractJõgede ökoloogilist seisundit mõjutavad jõgedele rajatud paisud. Paisude tulemusena mõjutatakse väga suurel määral voolurežiimi ning jões elavate organismide liikumisvõimalusi. Väga paljud paisud on amortiseerunud, nii ka Uueveski ojale rajatud pais. Magistritöö eesmärk on välja pakkuda lahendus paisu rekonstrueerimiseks. Lahenduse koostamise jaoks on teostatud hüdroloogilised arvutused, et välja selgitada maksimaalne vooluhulk, mille pais peab läbi suutma lasta. Hüdroloogilisi arvutusi on teostatud erinevate meetoditega väikeste vaatlusandmeteta valgaladele – K. Hommiku empiiriliste valemite abil, SNiP projekteerimisnormi põhjal ning hüdroloogiliste vaatlusandmete põhjal. Tehakse kokkuvõte erinevatest hüdroloogilistest arvutustest tulenevatest vooluhulkadest ning valitakse välja millise vooluhulga järgi on mõistlik rekonstrueerida pais. Hüdroloogiliste arvutuste põhjal on teostatud arvutused kahele lahendusele kuidas oleks mõistlik paisu rekonstrueerida. Ühe lahendusena pakutakse välja uus regulaator koos voolurahustiga. Teine lahendus oleks uus regulaator koos kalapääsuga. Magistritöös on uuritud ka võimalust paisu eemaldamiseks. Koos rekonstrueerimisega on vajalik uuendada ka regulaatori kohal olevat jalakäijate silda. Magistritöös on tehakse arvutused uue silla projekteerimiseks ning pakutakse välja jalakäijate silla lahendus.EST
dc.description.abstractEcological status of rivers affected by dams. Constructed of dams as a result of a very large extent, the current regime and the living organisms in the river mobility. Very many dams have depreciated so on Uueveski stream built the dam. In action front of a sign is to provide a solution to the reconstruction of the dam. A solution for the preparation of the hydrological calculations performed to find out the maximum flow rate which weir must be able to let out. Hydrological calculations are carried out with different methods of small no obsevation data area - K. Hommik empirical formulas, SNIP design standard, and a hydrological survey data. Summarize the different hydrological calculation resulting from the rates of the flow, and are selected by the sensible reconstruction of the dam. On the basis of the hydrological calculations performed in the way the two solution would be wise to reconstruct the dam. One solution is offered a new controller with stilling device. Another solution would be a new regulator with pool pass. In action research the possibility of dam removal. Along with the reconstruction of the regulator is required to upgrade members to the pedestrian bridge. In action calculations are made on a new design of the bridge, and provides a solution to the new bridge.EN
dc.subjectpaisudEST
dc.subjectrekonstrueerimineEST
dc.subjectkalakäigudEST
dc.subjectrahustuskaevudEST
dc.subjectsilladEST
dc.subjecthüdroloogilised arvutusedEST
dc.subjectojadEST
dc.subjectjärvedEST
dc.subjectUueveski (Viljandi)EST
dc.subjectmagistritöödEST
dc.titleViljandi Uueveski järve paisu rekonstrueerimineen_US
dc.title.alternativeReconstruction of the Viljandi Uueveski damen_US
dc.typeThesisen_US
dc.date.defensed2015-06-09


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record


DSpace software copyright © 2002-2015  DuraSpace
All items in EMU digital archive DSpace are protected by original copyright, with all rights reserved, unless otherwise indicated.